| Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
|---|---|---|---|
| June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – The support structure |
Pre-notification text of the preliminary market consultation – The support structure, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
| July 26, 2019 |
July 30, 2019 |
Preliminary market consultation – The support structure | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Feb. 27, 2020 | February 27, 2020 | Support structure of the COMPASS-U Tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U support structure system to initiate discussion have feedback on fabrication viability of the system. |
| Feb. 27, 2020 | February 27, 2020 | Model and drawings of Support structure |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
| April 20, 2020 | April 21, 2020 | Support structure of the COMPASS-U tokamak - Appendix_A-Cryostat |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| April 20, 2020 | April 21, 2020 | Model and drawings of the Cryostat v9 of COMPASS-U tokamak |
The model and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak for better understanding of manufacture procedure of Cryostat v9. |
| Oct. 21, 2020 | Nov. 12, 2020 | Soldered and brazed connections for COMPASS-U | This document describes requirements on soldered/brazed connections on various components of COMPASS-U tokamak. It is intended for consultations with manufacturers and brazing/soldering technologists. |
| Jan. 13, 2021 | Jan. 27, 2021 | Support structure of the COMPASS-U tokamak - Appendix_A-Cryostat | This update of document is intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Jan. 13, 2021 | Jan. 27, 2021 | Model and drawings of the Cryostat v8-D of COMPASS-U tokamak | The update of model and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak for better understanding of manufacture procedure of Cryostat v8-D. |
| March 15, 2021 | March 22, 2021 | Model and drawings of Support structure |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
| May 25, 2021 | May 26, 2021 | Drawings of cooled support structure parts | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
| Nov. 24, 2021 | Nov. 25, 2021 | Model of Support structure v.12 |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
| Jan. 26, 2022 | Jan. 27, 2022 | Detailed information and requirements for the support structure | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
| June 29, 2023 | June 29, 2023 | N/A | Based on questions raised during the preliminary market consultations, IPP shares the information on companies known to IPP that are able to secure Hot Isostatic Pressing (HIP) of components of the COMPASS-U support structure: Bodycote Europe, MTC Powder Solutions. |
| Technical drawing related to "Support structure of COMPASS-U tokamak" | |||
| April 7, 2022 | May 3, 2022 | Model and drawings of Support structure subpart | These documents shows possible modification of the c-frame assembly and is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
| March 28, 2022 | May 3, 2022 | Advanced information and requirements to the Support structure | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. It contented bill of material, part specification sheets and document with preliminary requirements. |
| June 20, 2023 | June 27, 2023 | Last summary information to the public tender | CU_CUPG-02_PMC_Final-information - basic parameters of the public tender, advance payments, deadlines etc. CU_CUPG-02_PMC_BOM.xlsx - the updated bill of materials, CU_CUPG-02_PMC_SpecificationOfComponents.pdf - description of individual parts, CU_CUPG-02_PMC_DrawingDocumentation.zip - partially updated drawing documentation, CU_CUPG-02-102530_V01_ASM_A01_CAD.stp – CAD data |
| Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
|---|---|---|---|
| June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – Coils of poloidal field and central solenoid |
Pre-notification text of the preliminary market consultation – Coils of poloidal field and central solenoid, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
| Oct. 9, 2019 | October 9, 2019 |
Fabrication procedure for poloidal coils of COMPASS-Upgrade tokamak
|
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Nov. 5, 2019 | November 5, 2019 | Fabrication procedure v1.1 for poloidal coils of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Oct. 4, 2019 | October 4, 2019 | Poloidal field coils of COMPASS-U tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| April 9, 2020 |
April 17, 2020 | Fabrication procedure for poloidal coils of COMPASS-Upgrade tokamak - v1.2 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Oct. 26, 2020 | Oct. 27, 2020 | Material selection for poloidal coils of COMPASS-Upgrade tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide information about materials planned for PF coils. |
| Oct. 30, 2020 | Nov. 2, 2020 | Fabrication procedure v1.3 for poloidal coils of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Oct. 21, 2020 | Nov. 12, 2020 | Soldered and brazed connections for COMPASS-U | This document describes requirements on soldered/brazed connections on various components of COMPASS-U tokamak. It is intended for consultations with manufacturers and brazing/soldering technologists. |
| Nov. 20, 2020 | Nov. 22, 2020 | Presentation of conceptual fabrication of CS and TF core of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Feb. 24, 2021 | Feb. 24, 2021 | Presentation of conceptual fabrication of CS and TF core of COMPASS-Upgrade tokamak v1.1 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| April 20, 2021 | April 20, 2021 | COMPASS-U Poloidal field coils and central solenoid coils v 1.1. | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Nov. 16, 2021 | Nov. 16, 2021 | COMPASS-U Poloidal field coils and central solenoid coils v 1.2.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| Dec. 22, 2021 | Dec. 23, 2021 | Specification of Paschen testing for PF coils v1.0 | This document provide basic information about the electrical insulation testing at Paschen condition. |
| March 31, 2022 | March 31, 2022 | Fabrication procedure v1.4 for poloidal coils of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| May 24, 2023 | May 26, 2023 | COMPASS-U Poloidal field coils general v 1.3.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback before tender is released. |
| May 24, 2023 | May 26, 2023 | Basic information for a supplier in the Czech Republic.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about Czech tender legislation. |
| August 2, 2023 | August 9, 2023 | Information for suppliers.edited_revHZP20230630.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about Czech tender legislation. |
| Sept. 11, 2024 | Sept. 12, 2024 | PMC tender administration.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about PF tender administration. |
| Oct. 24, 2024 | Nov. 5, 2024 | 2024.10.24-PMC tender administration-resolution.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about tender administration. |
| Dec. 12, 2024 | Dec. 12, 2024 | COMPASS-U Poloidal field coils general v 1.5.pdf | This document inform about Poloidal field coils for COMPASS-U tokamak before tender is released. |
| Technical drawing related to "Manufacture manual for PF coils of COMPASS-U tokamak" | |||
| Oct. 18, 2019 | October 18, 2019 | Model and drawing of the TF core of COMPASS-U tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
| April 9, 2020 | April 17, 2020 | Update of models and drawings of the TF core of COMPASS-U tokamak | These models and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
| April 15, 2020 | April 17, 2020 | PF coil models of COMPASS-U tokamak |
These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
| April 16, 2020 | April 17, 2020 | CS coil models of COMPASS-U tokamak | These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
| May 22, 2020 | May 22, 2020 | Central solenoid wound on TF core parts | These models and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
| Nov. 10, 2020 | Nov. 10, 2020 | Tie tube´s models of COMPASS-Upgrade tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide information about Tie tube part planned for CS coils. |
| Nov. 16, 2021 | Nov. 16, 2021 | PF coil models of COMPASS-U tokamak | These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
| Nov. 18, 2021 | Nov. 18, 2021 | PF4 alternative coil model of COMPASS-U tokamak |
This model is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
| March 1, 2022 | April 4, 2022 | PF coil models of COMPASS-U tokamak | These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
| May 24, 2023 | May 26, 2023 | PF1aL model and drawings | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback on techical aspects of coils before tender is released. |
| Sept. 5, 2024 | Sept. 5, 2024 | PF drawings.zip | This documents is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback on techical aspects of coils before tender is released. |
| Oct. 31, 2024 | Nov. 1, 2024 | PF coils 3D models.zip | These 3D models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback on techical aspects of coils before tender is released. |
| Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
|---|---|---|---|
| June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – |
Pre-notification text of the preliminary market consultation – The vacuum vessel, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
| June 28, 2019 |
July 8, 2019 |
Preliminary market consultation – | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Vacuum Vessel system to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
| October 5, 2020 | October 5, 2020 | Model of Vacuum vessel - COMPASS-U tokamak project | This model is intended for the companies who shown interest in the Preliminary Market Consultation for the Vacuum vessel of COMPASS-U for better understanding of design and manufacturing procedures. |
| May 27, 2021 | May 28, 2021 | Preliminary market consultation – Vacuum vessel |
This document is intended to provide a recent update of the COMPASS-U Vacuum Vessel to initiate the discussion within the Preliminary Market Consultations prior launching the manufacturing tenders. It provides an essential information and details to evaluate the scope and feasibility of the system. |
| May 27, 2021 | May 28, 2021 | Preliminary market consultation – Port extensions & bellows | This document is intended to provide a recent update of the COMPASS-U Port extensions and Bellows to initiate the discussion within the Preliminary Market Consultations prior launching the manufacturing tenders. It provides an essential information and details to evaluate the scope and feasibility of the system. |
| June 4, 2021 | June 7, 2021 | Vacuum vessel assembly including heating loops and fastener elements | This document is intended to provide a recent update of the COMPASS-U vacuum vessel assembly including heating loops and fastener elements to initiate the discussion within the Preliminary Market Consultations prior launching the manufacturing tenders. It provides an essential information and details to evaluate the scope and feasibility of the system. |
| July 11, 2022 | July 18, 2022 | Status of the Vacuum vessel - COMPASS-U tokamak |
Updated overview and technical requirements on the vacuum vessel of the COMPASS-U tokamak. |
| July 11, 2022 | July 18, 2022 | Model of integral HFS of the Vacuum vessel - COMPASS-U tokamak | Model of the integral inner wall of the vacuum vessel of the COMPASS-U tokamak for feasibility evaluation. |
| Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
|---|---|---|---|
| October 27, 2023 |
November 7,2023 |
Preliminary market consultation – RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak |
Pre-notification text of the preliminary market consultation – RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
| November 8, 2023 | November 29, 2023 | Introduction-to-ECRH-system-for-COMPASS-Upgrade | This document is intended for the companies that have shown interest in the Preliminary Market Consultation for RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak to initiate discussion and have feedback on the feasibility of RF source. It will provide very basic information about the system which is in the Design Phase. |
Hight voltage high power supplies for RF source (Gyrotron)
| Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
|---|---|---|---|
| March 13, 2024 |
March 26, 2024 |
Preliminary market consultation - Hight voltage high power supplies for RF source (Gyrotron) |
Pre-notification text of the preliminary market consultation - Hight voltage high power supplies for RF source (Gyrotron), which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
| July 30, 2024 | July 31, 2024 | Description of the HV PS system for ECRH system of COMPASS-U tokamak | This document is intended for the companies that have shown interest in the Preliminary Market Consultation for Hight voltage high power supplies for RF source (Gyrotron) to initiate discussion and have feedback on the feasibility of high voltage power supplies. It will provide very basic information about the system which is in the Design Phase. |
| October 17, 2024 | November 29, 2024 | Preliminary proposed information about tender condition and contrat |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak to initiate discussion and have feedback on the tender and contract condition. |
| Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
|---|---|---|---|
| April 11, 2025 |
April 17, 2025 |
CAD model of the cryostat |
Preliminary CAD model of the COMPASS Upgrade cryostat. The model contains the main parts of the cryostat and space envelopes for vacuum distribution piping (to be designed by the supplier). |
| May 15, 2025 | May 21, 2025 | Cryostat overview | Basic information on cryostat project. |
| May 15, 2025 | May 21, 2025 | Cryostat design overview | Overview of cryostat mechanical design. |
| May 15, 2025 | May 21, 2025 | Cryostat structural analysis | Preliminary FEM analysis of cryostat. |
| May 15, 2025 | May 21, 2025 | Vacuum requirements | General COMPASS-U vacuum requirements (cleaning, surface finish etc.). |