Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – The cryogenic cooling system | Pre-notification text of the preliminary market consultation – The cryogenic cooling system, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
Jan. 16, 2020 |
February 3, 2020 |
The cryogenic cooling system - multilayer cryogenic insulation (MLI) | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Cryogenic system to initiate discussion and have feedback on feasibility of multilayer cryogenic insulation (MLI). It will provide very basic information about the system which is in the Design Phase. |
May 20, 2020 | May 20, 2020 | The cryogenic cooling system - Introductory presentation | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Cryogenic system to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
June 23, 2020 | June 29, 2020 | The cryogenic cooling system - Multilayer insulation (MLI) at COMPASS-U |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Cryogenic system to initiate discussion and have feedback on feasibility of multilayer cryogenic insulation (MLI). It will provide very basic information about the system which is in the Design Phase. |
July 1, 2020 | July 1, 2020 | The cryogenic cooling system - Update of introductory presentation v1.1 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Cryogenic system to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – The support structure |
Pre-notification text of the preliminary market consultation – The support structure, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
July 26, 2019 |
July 30, 2019 |
Preliminary market consultation – The support structure | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Feb. 27, 2020 | February 27, 2020 | Support structure of the COMPASS-U Tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U support structure system to initiate discussion have feedback on fabrication viability of the system. |
Feb. 27, 2020 | February 27, 2020 | Model and drawings of Support structure |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
April 20, 2020 | April 21, 2020 | Support structure of the COMPASS-U tokamak - Appendix_A-Cryostat |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
April 20, 2020 | April 21, 2020 | Model and drawings of the Cryostat v9 of COMPASS-U tokamak |
The model and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak for better understanding of manufacture procedure of Cryostat v9. |
Oct. 21, 2020 | Nov. 12, 2020 | Soldered and brazed connections for COMPASS-U | This document describes requirements on soldered/brazed connections on various components of COMPASS-U tokamak. It is intended for consultations with manufacturers and brazing/soldering technologists. |
Jan. 13, 2021 | Jan. 27, 2021 | Support structure of the COMPASS-U tokamak - Appendix_A-Cryostat | This update of document is intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Jan. 13, 2021 | Jan. 27, 2021 | Model and drawings of the Cryostat v8-D of COMPASS-U tokamak | The update of model and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for Support structure of COMPASS-U tokamak for better understanding of manufacture procedure of Cryostat v8-D. |
March 15, 2021 | March 22, 2021 | Model and drawings of Support structure |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
May 25, 2021 | May 26, 2021 | Drawings of cooled support structure parts | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
Nov. 24, 2021 | Nov. 25, 2021 | Model of Support structure v.12 |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
Jan. 26, 2022 | Jan. 27, 2022 | Detailed information and requirements for the support structure | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
June 29, 2023 | June 29, 2023 | N/A | Based on questions raised during the preliminary market consultations, IPP shares the information on companies known to IPP that are able to secure Hot Isostatic Pressing (HIP) of components of the COMPASS-U support structure: Bodycote Europe, MTC Powder Solutions. |
Technical drawing related to "Support structure of COMPASS-U tokamak" | |||
April 7, 2022 | May 3, 2022 | Model and drawings of Support structure subpart | These documents shows possible modification of the c-frame assembly and is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. |
March 28, 2022 | May 3, 2022 | Advanced information and requirements to the Support structure | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Support structure for better understanding of design solution. It contented bill of material, part specification sheets and document with preliminary requirements. |
June 20, 2023 | June 27, 2023 | Last summary information to the public tender | CU_CUPG-02_PMC_Final-information - basic parameters of the public tender, advance payments, deadlines etc. CU_CUPG-02_PMC_BOM.xlsx - the updated bill of materials, CU_CUPG-02_PMC_SpecificationOfComponents.pdf - description of individual parts, CU_CUPG-02_PMC_DrawingDocumentation.zip - partially updated drawing documentation, CU_CUPG-02-102530_V01_ASM_A01_CAD.stp – CAD data |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
June 10, 2019 |
June 14, 2019 |
Preliminary market consultation –
|
Pre-notification text of the preliminary market consultation –
Coils of toroidal field,
which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
Nov. 1, 2019 | November 1, 2019 | Toroidal field coils of the COMPASS-U tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Feb.18, 2020 | February 18, 2020 | Toroidal field coils of the COMPASS-U tokamak v2.0 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Feb.18, 2020 | February 18, 2020 | Model and drawings of TF coils of COMPASS-U tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
May 22, 2020 | May 22, 2020 | Central solenoid wound on TF core parts | These models and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
July 16, 2020 | July 21, 2020 | Toroidal field coils of the COMPASS-U tokamak v3.0 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
July 16, 2020 | July 21, 2020 | Model and drawings of TF coils of COMPASS-U tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Oct. 21, 2020 | Nov. 12, 2020 | Soldered and brazed connections for COMPASS-U | This document describes requirements on soldered/brazed connections on various components of COMPASS-U tokamak. It is intended for consultations with manufacturers and brazing/soldering technologists. |
March 3, 2021 | March 4, 2021 | Spring plates for sliding joint of COMPASS Upgrade tokamak v0.1 | Preliminary drawings of spring plates |
April 15, 2021 | April 19, 2021 | ANSYS model of support structure with simplified geometry of toroidal field coils (v8) of the COMPASS-U tokamak. (1.5 GB) | This document is intended for the companies who shown interest to do test of alternative geometries of toroidal field coils. Model contains volumetric forces for the worst case scenario. |
April 15, 2021 | April 19, 2021 | Detailed STEP model of TF coils (v08) of COMPASS-U tokamak | This document is intended for the companies who shown interest in modification of toroidal field coils geometry. |
May 13, 2021 | May 13, 2021 | Toroidal field coils of the COMPASS-U tokamak v4.0 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Oct. 18, 2021 | Oct. 18, 2021 | Toroidal field coils of the COMPASS-U tokamak v5.0 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Oct. 18, 2021 | Oct. 18, 2021 | Model of TF coils of COMPASS-U tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Oct. 18, 2021 | Oct. 18, 2021 | Drawings of TF coils of COMPASS-U tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Toroidal field coils for better understanding of manufacture procedure. |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – Coils of poloidal field and central solenoid |
Pre-notification text of the preliminary market consultation – Coils of poloidal field and central solenoid, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
Oct. 9, 2019 | October 9, 2019 |
Fabrication procedure for poloidal coils of COMPASS-Upgrade tokamak
|
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Nov. 5, 2019 | November 5, 2019 | Fabrication procedure v1.1 for poloidal coils of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Oct. 4, 2019 | October 4, 2019 | Poloidal field coils of COMPASS-U tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
April 9, 2020 |
April 17, 2020 | Fabrication procedure for poloidal coils of COMPASS-Upgrade tokamak - v1.2 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Oct. 26, 2020 | Oct. 27, 2020 | Material selection for poloidal coils of COMPASS-Upgrade tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide information about materials planned for PF coils. |
Oct. 30, 2020 | Nov. 2, 2020 | Fabrication procedure v1.3 for poloidal coils of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Oct. 21, 2020 | Nov. 12, 2020 | Soldered and brazed connections for COMPASS-U | This document describes requirements on soldered/brazed connections on various components of COMPASS-U tokamak. It is intended for consultations with manufacturers and brazing/soldering technologists. |
Nov. 20, 2020 | Nov. 22, 2020 | Presentation of conceptual fabrication of CS and TF core of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Feb. 24, 2021 | Feb. 24, 2021 | Presentation of conceptual fabrication of CS and TF core of COMPASS-Upgrade tokamak v1.1 | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
April 20, 2021 | April 20, 2021 | COMPASS-U Poloidal field coils and central solenoid coils v 1.1. | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Nov. 16, 2021 | Nov. 16, 2021 | COMPASS-U Poloidal field coils and central solenoid coils v 1.2.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
Dec. 22, 2021 | Dec. 23, 2021 | Specification of Paschen testing for PF coils v1.0 | This document provide basic information about the electrical insulation testing at Paschen condition. |
March 31, 2022 | March 31, 2022 | Fabrication procedure v1.4 for poloidal coils of COMPASS-Upgrade tokamak | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
May 24, 2023 | May 26, 2023 | COMPASS-U Poloidal field coils general v 1.3.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback before tender is released. |
May 24, 2023 | May 26, 2023 | Basic information for a supplier in the Czech Republic.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about Czech tender legislation. |
August 2, 2023 | August 9, 2023 | Information for suppliers.edited_revHZP20230630.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about Czech tender legislation. |
Sept. 11, 2024 | Sept. 12, 2024 | PMC tender administration.pdf | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to inform about PF tender administration. |
Technical drawing related to "Manufacture manual for PF coils of COMPASS-U tokamak" | |||
Oct. 18, 2019 | October 18, 2019 | Model and drawing of the TF core of COMPASS-U tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
April 9, 2020 | April 17, 2020 | Update of models and drawings of the TF core of COMPASS-U tokamak | These models and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
April 15, 2020 | April 17, 2020 | PF coil models of COMPASS-U tokamak |
These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
April 16, 2020 | April 17, 2020 | CS coil models of COMPASS-U tokamak | These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
May 22, 2020 | May 22, 2020 | Central solenoid wound on TF core parts | These models and drawings are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure of CS coils wound on TF core. |
Nov. 10, 2020 | Nov. 10, 2020 | Tie tube´s models of COMPASS-Upgrade tokamak |
This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion have feedback on fabrication viability of the system. It will provide information about Tie tube part planned for CS coils. |
Nov. 16, 2021 | Nov. 16, 2021 | PF coil models of COMPASS-U tokamak | These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
Nov. 18, 2021 | Nov. 18, 2021 | PF4 alternative coil model of COMPASS-U tokamak |
This model is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
March 1, 2022 | April 4, 2022 | PF coil models of COMPASS-U tokamak | These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils for better understanding of manufacture procedure. |
May 24, 2023 | May 26, 2023 | PF1aL model and drawings | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback on techical aspects of coils before tender is released. |
Sept. 5, 2024 | Sept. 5, 2024 | PF drawings.zip | This documents is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Poloidal field coils to initiate discussion and have final feedback on techical aspects of coils before tender is released. |
The central solenoid coils
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
January 3, 2023 |
January 5, 2023 | Preliminary market consultation – The central solenoid coils |
Pre-notification text of the preliminary market consultation – The central solenoid coils, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
Technical drawing related to "Central solenoid coils of COMPASS-U tokamak" | |||
January 3, 2023 | January 5, 2023 |
TF core model of COMPASS-Upgrade tokamak v1.1
|
These models are intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Central solenoid coils for better understanding of manufacture procedure of CS coils wound on TF core. |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
June 10, 2019 |
June 14, 2019 |
Preliminary market consultation – |
Pre-notification text of the preliminary market consultation – The vacuum vessel, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
June 28, 2019 |
July 8, 2019 |
Preliminary market consultation – | This document is intended for the companies who shown interest in the Preliminary Market Consultation for COMPASS-U Vacuum Vessel system to initiate discussion have feedback on fabrication viability of the system. It will provide very basic information about the system which is in the Design Phase. |
October 5, 2020 | October 5, 2020 | Model of Vacuum vessel - COMPASS-U tokamak project | This model is intended for the companies who shown interest in the Preliminary Market Consultation for the Vacuum vessel of COMPASS-U for better understanding of design and manufacturing procedures. |
May 27, 2021 | May 28, 2021 | Preliminary market consultation – Vacuum vessel |
This document is intended to provide a recent update of the COMPASS-U Vacuum Vessel to initiate the discussion within the Preliminary Market Consultations prior launching the manufacturing tenders. It provides an essential information and details to evaluate the scope and feasibility of the system. |
May 27, 2021 | May 28, 2021 | Preliminary market consultation – Port extensions & bellows | This document is intended to provide a recent update of the COMPASS-U Port extensions and Bellows to initiate the discussion within the Preliminary Market Consultations prior launching the manufacturing tenders. It provides an essential information and details to evaluate the scope and feasibility of the system. |
June 4, 2021 | June 7, 2021 | Vacuum vessel assembly including heating loops and fastener elements | This document is intended to provide a recent update of the COMPASS-U vacuum vessel assembly including heating loops and fastener elements to initiate the discussion within the Preliminary Market Consultations prior launching the manufacturing tenders. It provides an essential information and details to evaluate the scope and feasibility of the system. |
July 11, 2022 | July 18, 2022 | Status of the Vacuum vessel - COMPASS-U tokamak |
Updated overview and technical requirements on the vacuum vessel of the COMPASS-U tokamak. |
July 11, 2022 | July 18, 2022 | Model of integral HFS of the Vacuum vessel - COMPASS-U tokamak | Model of the integral inner wall of the vacuum vessel of the COMPASS-U tokamak for feasibility evaluation. |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
March 31, 2020 |
April 3, 2020 |
Preliminary market consultation – The COMPASS-U plasma facing components |
Pre-notification text of the preliminary market consultation – The COMPASS-U plasma facing components, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
April 8, 2020 | April 8, 2020 | Description of the COMPASS-U tokamak plasma-facing components (PFC) |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for COMPASS-U plasma-facing components to initiate discussion, to have feedback on fabrication and viability of the components. It provides very basic information about the components which are still in Design Phase. |
May 22, 2020 | May 22, 2020 | Update -Description of the COMPASS-U tokamak plasma-facing components (PFC) |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for COMPASS-U plasma-facing components to initiate discussion, to have feedback on fabrication and viability of the components. It provides very basic information about the components which are still in Design Phase. |
June 24, 2020 | June 24, 2020 | Update - Description of the COMPASS-U tokamak plasma-facing components (PFC) |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for COMPASS-U plasma-facing components to initiate discussion, to have feedback on fabrication and viability of the components. It provides very basic information about the components which are still in Design Phase. |
Feb. 1, 2021 | Feb. 1, 2021 | Update -Description of the COMPASS-U tokamak plasma-facing components (PFC) |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for COMPASS-U plasma-facing components to initiate discussion, to have feedback on fabrication and viability of the components. It provides very basic information about the components which are still in Design Phase. |
March 18, 2021 | March 22, 2021 | Step files of selected PFC tiles and of the support structure for the divertor (cassette) |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for the COMPASS-U plasma-facing components to initiate discussions on the fabrication viability of different elements. It provides the models of selected PFC tiles with typical foreseen attachment schemes and shapes, as well as the model of the support structure of the divertor, so-called divertor cassette. Manufacturing tolerances are +/- 0.1mm for the tiles and +/- 0.1mm (in green) and +/- 0.5 mm (in grey) for the cassette (pictures attached in case the colors are not visible in the cassette step file). |
May 18, 2021 | May 19, 2021 | Step files of selected PFC tiles and of the support structure for the divertor (cassette) |
This document is intended for the companies that have shown interest in the Preliminary Market Consultation for the COMPASS-U plasma-facing components to initiate discussions on the fabrication viability of different elements. It provides the models and drawings of selected PFC tiles with typical foreseen attachment schemes and shapes, as well as the model of the support structure of the divertor, so-called divertor cassette. Manufacturing tolerances are +/- 0.1mm for the tiles and +/- 0.1mm (in green) and +/- 0.5 mm (in grey) for the cassette (pictures attached in case the colors are not visible in the cassette step file). |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
April 6, 2023 |
April 21, 2023 |
Preliminary market consultation – Sub-THz Interferometer |
Pre-notification text of the preliminary market consultation – Sub-THz Interferometer, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
June 5, 2023 | June 5, 2023 | Design of Sub-THz Unambiguous Interferometer for COMPASS-U | This document is intended for the companies who shown interest in the Preliminary Market Consultation for Sub-THz Interferometer to initiate discussion and have final feedback before tender is released. |
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
October 27, 2023 |
November 7,2023 |
Preliminary market consultation – RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak |
Pre-notification text of the preliminary market consultation – RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak, which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
November 8, 2023 | November 29, 2023 | Introduction-to-ECRH-system-for-COMPASS-Upgrade | This document is intended for the companies that have shown interest in the Preliminary Market Consultation for RF source (Gyrotron) for ECRH system of the COMPASS Upgrade tokamak to initiate discussion and have feedback on the feasibility of RF source. It will provide very basic information about the system which is in the Design Phase. |
Hight voltage high power supplies for RF source (Gyrotron)
Date of creation |
Date of publication |
Documentation title |
Description of the documentation
|
---|---|---|---|
March 13, 2024 |
March 26, 2024 |
Preliminary market consultation - Hight voltage high power supplies for RF source (Gyrotron) |
Pre-notification text of the preliminary market consultation - Hight voltage high power supplies for RF source (Gyrotron), which was publicated on the TED (Tenders Electronic Daily) and on the VĚSTNÍK VEŘEJNÝCH ZAKÁZEK. |
July 30, 2024 | July 31, 2024 | Description of the HV PS system for ECRH system of COMPASS-U tokamak | This document is intended for the companies that have shown interest in the Preliminary Market Consultation for Hight voltage high power supplies for RF source (Gyrotron) to initiate discussion and have feedback on the feasibility of high voltage power supplies. It will provide very basic information about the system which is in the Design Phase. |